Garage Conversion Cost Calculator
Turn a garage into conditioned flexible space with clear lines for the shell finish, bath, kitchenette, and code-driven systems.
Your project scope
Converted garage area (sq ft)iConverted garage area (sq ft) Enter the planned sq ft amount. | |
|---|---|
Finish leveliFinish level Finish includes framing, drywall, flooring, and typical windows/doors. | |
BathroomiBathroom Plumbing routes and fixture count drive this large scope. | |
KitchenetteiKitchenette Appliances and cabinetry are modeled as a project allowance. | |
Insulation & electricaliInsulation & electrical Converted garages commonly need insulation, new circuits, and HVAC coordination. | |
Your stateiYour state Scales U.S.-average labor and material midpoints for typical state-level pricing. It is not an on-site bid. |
How to use this calculator
- Enter the converted garage area (sq ft).
- Choose each scope driver to reflect your project.
- Select your state for cost scaling.
- Review the itemized components before requesting bids.
Results explained
This model uses separate construction components rather than a single blanket rate. The band reflects common variation in access, design, and contractor pricing.
Quick reference: Garage Conversion Cost cost drivers
Installed U.S.-average midpoints before the selected state adjustment.
| Scope | Midpoint |
|---|---|
| Basic ADU-lite finish | $115/sq ft |
| Mid living finish | $165/sq ft |
| Full bathroom | $18,500 |
| Full kitchenette | $24,000 |
These are planning midpoints, not a site inspection, engineering opinion, or contractor proposal.
How the estimate is built
Base finish is applied to area, while bath, kitchen, and systems selections add itemized components; permits are state-scaled.
Example scenario
A 480 sq ft mid-finish conversion with a full bath and basic kitchenette models around $111,000 before state differences.
FAQ
Is this a legal ADU?
Not necessarily. Zoning, parking, egress, and utility requirements determine legal use.
Is HVAC included?
The systems package includes a planning allowance; duct extensions or a mini-split may vary.
Does it include a new slab?
No. Major slab leveling, moisture mitigation, or structural work needs inspection.